1 Whitebrook Way, Cwmbran NP44 3PX, United Kingdom +44 7988 623394 [email protected] Mon–Fri 08:30–17:30 UK

Implementation

A quarter beside your current process, then the current process stops.

We do not switch a reporting pack off on a Monday because a workshop went well. The new line runs in parallel with the pack you already trust. It takes over only when your approvers say the two match.

A woman working at a laptop in a furnished office

Four phases

Phase 1 · about two weeks

Discovery on a real pack

We read the last complete quarter: statements, notices, letters, the administrator file and the workbook someone actually used. We list every figure that is typed rather than referenced.

You leave with a map of sources, a list of breaks we would have stopped, and a decision on whether the work is worth doing. If it is not, we say so.

Phase 2 · three to six weeks

Model, rules and templates

Columns are mapped. Tie-out rules are written in plain language and signed by your finance lead. Templates are built to the documents investors already receive, including an ILPA-style workbook if you use one.

Bank details, approver names and the notice calendar are entered by your staff. We do not copy them out of an old PDF and call them certified.

Phase 3 · one reporting period

Parallel run

You produce the pack the way you do now. We produce the same pack from the mapped sources. Differences are a schedule, not a debate in email. Wording changes and mapping fixes happen here, while investors still receive your existing process.

The parallel pack is watermarked. It is not sent.

Phase 4 · the next close

Live release, or a handover

If the parallel run matches, the following close is released through Acouchiavo after your approvers accept it. You can keep us on a managed production retainer, or your own team can run the line with us on call for mapping changes.

Either way the archive, the rules and the templates stay documented. They are not trapped in one contractor’s laptop.

What we ask from you

  • A finance lead who can explain the current pack and sign the tie-out rules.
  • The last full quarter, redacted if you need, plus the source files that fed it.
  • Named approvers for statements and, separately if you wish, for cash notices.
  • A decision at the end of the parallel run: go live, adjust, or stop.

What stays with you

  • Valuations, investment decisions and anything you say to investors about performance.
  • The choice of regulatory classification, SDR labels and what an Annex IV-style filing should contain.
  • The relationship with your limited partners, your administrator, your depositary and your auditor.
  • Final release. A pack is not “sent by Acouchiavo” unless your release step says it is.

Fees

Discovery is a fixed piece of work, quoted before we start. Build and the parallel run are quoted from the number of vehicles, investor accounts and document types, not from a day-rate that drifts.

Managed production is a monthly fee covering the agreed closes and a set number of mapping changes. Notices outside the calendar are quoted. Invoices are due within 30 days. Late payment can pause a close that has not yet been released. It does not give us a right to send a pack.

The engagement terms are on the terms page. Questions go to [email protected] or +44 7988 623394.